Allée de baies dans un datacenter DC2SCALE
AI clusters

Your AI cluster in France, from a few racks to several megawatts

We host your GPUs in our datacenters: power, cooling, security and teams on site 24/7. First tranche delivered in 4 to 8 weeks.

Estimate your cluster's power

NVIDIA
GB300 NVL72 72 GPUs per rack, 140 kW
GB200 NVL72 72 GPUs per rack, 132 kW
HGX B300 40 GPUs per rack, 72 kW
HGX B200 40 GPUs per rack, 65 kW
HGX H200 48 GPUs per rack, 61 kW
HGX H100 48 GPUs per rack, 48 kW
RTX PRO 6000 Server 80 GPUs per rack, 63 kW
AMD
Instinct MI355X 80 GPUs per rack, 112 kW
Instinct MI325X 40 GPUs per rack, 65 kW
Ancillary racks: network, storage, CPU nodes
  • Mellanox Quantum-X800 InfiniBand Counted per rack, 15 kW
  • Mellanox Spectrum-X Ethernet Counted per rack, 12 kW
  • Baie stockage Counted per rack, 8 kW
  • Baie réseau et management Counted per rack, 6 kW
  • Baie nœuds CPU Counted per rack, 12 kW
Other hardware

Your configuration

Pick a hardware type to start.

IT power

Configure your cluster

The offer in figures

Density

128 kW per rack, a common density on our sites

Lead time

4 to 8 weeks for a first tranche up to 1 MW

Energy

1.35 PUE contractually capped

Answer

48 h working hours for a costed answer from an engineer

Density

One GB300 rack draws as much as ten classic colocation racks

Rangée de baies haute densité dans un datacenter DC2SCALE
The situation

Power becomes the main constraint

In a classic colocation room, the limit is floor space. With GPU racks above 100 kW, the limit becomes the power and cooling available per square metre.

Our answer

Rooms built for power density

Our rooms are built for racks at 128 kW and above: power distribution and cooling are sized at construction.

Cooling

Liquid cooling adapted to your hardware

Rear-door, direct-to-chip or immersion: the architecture is defined with you during the technical study.

Energy

Electricity billed at market price, PUE capped by contract

Spot

Indexed on the market

Electricity rebilled at the month's spot price

Electricity consumed is rebilled monthly at the market spot price plus market, with no multi-year smoothing.

1.35

PUE cap

Datacenter overhead capped at 1.35

The PUE is contractually capped at 1.35: technical equipment consumption above this threshold is borne by us.

MW

What you reserve

Reserved power, energy billed on meter readings

The contract covers IT power made available at all times. Energy consumed is rebilled separately, on meter readings.

Lead times

Three steps to power-on

Illustration d'une sélection en ligne
1.

You describe your hardware

The configurator works out power, density and rack count from your hardware. The estimate takes five minutes.

Illustration d'un message reçu
2.

An engineer calls you back

Within 48 working hours, with the available capacity, the site and the delivery date.

Illustration d'une mise en service
3.

You deploy

400 kW to 1 MW in 4 to 8 weeks. 1 to 3 MW in 3 to 4 months. Your teams get access from delivery.

No middleman

You deal directly with the datacenter operator

DC2SCALE operates its own datacenters with its own teams. The estimate is available without an NDA and an engineer answers your request within 48 working hours.

Supervision des installations par une équipe DC2SCALE

Your cluster

Describe your cluster project

In a few minutes the configurator gives you the power, the number of racks and the budget range of your project. An engineer then calls you back within 48 working hours.

Équipements de datacenter chargés pour livraison sur site